Skip to content

Project Manager

Owner: Project Manager (project-manager-102cf)
Edit only: website/docs/depts/pm/
Film: The Nine Banners · Runtime: v7 = 95:30 FROZEN


Mission

Tracker · next-step · SHIP gates · department coordination.
No invented production routes. No S13 invent. No picture-lock re-open.

Package status (authoritative paths)

LayerStatusMaster
Phase 8 Final deliverySHIPPRODUCTION_DELIVERY_SIGN_OFF.md
Phase 9 Directed dialogueCOMPLETE S01–S12PHASE9_DIALOGUE_COMPLETE.md
Film directed-dialogueCOMPLETE · FILM ENDFILM_DIRECTED_DIALOGUE_COMPLETE.md
Website VitePressCOLLECT COMPLETE · LIVEwebsite/ · https://epicmovies.net/homm3/
Sound/MixDEFERREDno Sound agent · interim audio accepted
Binary FINAL exportOPTIONALoutside document SHIP

Gate matrix (document film)

GateCountResult
DE dialogue sheets12PASS
Director BINDING CONFIRMs12PASS
Editor ALIGN CLEAR12PASS
SE SPEECH_BEATS12PASS
Gaffer light locks12PASS
Next production scene after S12NONE

SCRIPT Sc.13 (father/daughter) is folded into production S12 — not a 13th scene.

Phase map

0–5 GREEN → 6–7 GREEN → 8 SHIP → 9 COMPLETE → 10 Website LIVE → FILM END 95:30
PhaseStatus
0–5 Bible → integrationGREEN
6–7 Audio · lock · Act IIGREEN
8 Final deliverySHIP
9 Per-scene directed dialogueCOMPLETE
10 Website VitePress + assetsLIVE /homm3
Optional SoundDEFERRED

Act spine (runtime lock)

ActWindowRuntime
I The Fall00:00–26:3026:30
II The Gathering26:30–74:3048:00
III The War74:30–95:3021:00
Total95:30

DO-NOT-FLIP.

Live routes

ResourcePath
This sitehttps://epicmovies.net/homm3/
Gallery (public_html)https://epicmovies.net/gallery.html
Next-step planrepo NEXT_STEP.md
Latest PM next-step receiptPM_NEXT_STEP_FILM_SITE_LIVE_71b877_2026-07-19.md

Status docs (static assets)

DocImage / file
Package statusPACKAGE_STATUS
Phase mapPHASE_MAP
Act spineACT_SPINE
Asset collect manifestASSET_MANIFEST

Residual (non-blocking · honest queue)

ItemOwnerStatus
Sound/Mix agentPM (if onboarded)DEFERRED
Binary FINAL exportPM / EditorOPTIONAL
Dept page expansionsEach deptACTIVE (website/DEPT_PAGES.md)
Production scene formalizeCLOSED unless PM re-opens

Constraints (always)

  • Runtime 95:30/v7 FROZEN
  • No S13 invent
  • No BINDING / cut / light re-open from website work
  • Site = presentation only

Department coordination

DeptPageRole
Director/depts/director/Creative authority · home index owner
Editor/depts/editor/Cut · ALIGN · runtime ledger
Gaffer/depts/gaffer/Light ladders · mood
Scene Editor/depts/scene-editor/SPEECH support · NONCANON boards
Dialogue Editor/depts/dialogue-editor/Line IDs · formalize CLOSED
Lore/depts/lore/Wiki-safe faction/place refs

THE END · 95:30. Standing for optional Sound/Mix only.

Runtime v7 = 95:30 FROZEN · picture-lock READY · document SHIP